RBD K4 SHLW Bollard

RBD/4 SHLW Bollard

(Reinforced – Fixed – Shallow Mount Model)

Technical Features


Crash / Impact Rating :

Crash tested and certified according to ASTM F2656-15 at M50 (K-12) level (HBD 275 S 100) also designed and produced to withstand impacts mentioned below:

StandardVehicle TypeWeightSpeed
ASTM F2656M, C7 (K-4)6800, 7200 kg48 km/h
(30 mph)
PAS 68N2, N37500 kg48 km/h
(30 mph)
IWA 14-1N2A, N2B, N3C7200 kg48 km/h
(30 mph)

(Please contact for applicable product dimensions.)


Bollard Structure:

950 mm high bollard pipe is made of Ø273 mm (Ø278 mm with sleeve), 10 mm thick hot dip galvanised solid steel pipe with a reinforceddesign.
Special star-formed, 10 mm solid steel bar and composite infilled inner structure for impact absorption distributed evenly to the whole body and increasing resistance.
Impact surface is painted in RAL9006 (optionally in other RAL colors).
Designed so that no vehicle crashing effect can displace it after embedded into the ground.
Furnished with red (opt. white or yellow) reflecting strips.
Bollard contains high resistant anchorage structure through 2 anchor plates with concrete immersion slits at the top and bottom, strengthened with “HEB” beams in the impact direction and adjustment bolts for leveling at 4 areas.
Underground elements are fixed together by wedge type, 10.9 grade bolted and welded connection for utmost resistance reinforcement. 


Optional Features and Accessories :

Removable structue (designed and produced to withstand impacts at ASTM F2656 M50, C750 (K-12), PAS 68 [N3]/80 and IWA 14-1 [N3C]/80 levels), demountable aluminium (electrostatic powder coated in body color or 304/316 grade stainless steel) bollard top lid with 360° visible red flashing LED indicators, stainless steel sleeve (304/316 grade), different colors, different product dimensions.


Installation:

Easy levelling with 4 bolts and installation to 250 mm shallow depth with steel rebar reinforcement and C35 grade concrete through ground mounting plate containing concrete immersion slits. Ground levelling and preparation works shall be carried on before pouring the concrete.
Allowable bearing value of the ground shall be minimum 1/2 kg/ cm², if not, works shall be carried on to fulfil. Installation shall be done according to the manufacturer’s instructions.